Bradbury Petrol Station

Back to Case Studies
Bradburypetrolstation (1)

A busy fuel station in Bradbury underwent an upgrade. The project required carpark drainage that was load Classification B rated, with the lockdown feature

SabDrain’s 601 Steel grated channel was the ideal choice given that it is designed to withstand passenger vehicles along with light commercial traffic.

The grate has a lockdown which enables it to be anti-theft and rattle free. A heel guard specified grate ensures no heeled shoes are likely to be caught in its rated small grid size.