As apart of the Campsie Train Station upgrade, 25M of SAB705 500mm x 500mm was installed. The station was upgraded with level access between platforms and trains, platform screen doors and a new look, and will have a new train every 4 minutes during peak hours.
SAB705 500mm x 500mm was installed by Sydney Trains to drain large amounts of water off a downward slope, helping to keep the tracks safe and the transport network running smoothly.